60-SECOND DEMO

Watch a record get sealed.

No signup. No download. Every screen below is what an installer sees on their phone when they log a wood-flooring install — the questions, the readings, the sign-offs, and the moment the record becomes tamper-evident.

Fake address, fake product, fake signatures. Real flow.

1

The job

Installer opens the app, picks the property.

SpecRecord · mobile
MOISTURE PRE-INSTALL
42 Cedar Court, Unit 3B
Portland, OR · concrete subfloor · Bona SafeSet S16 adhesive
Step 1 of 6 · getting started
2

The checklist — three-state, one thumb

Every question is Pass / Fail / N/A. When it's Fail, the app asks why and demands a photo. Nothing gets logged until the answer is real.

SpecRecord · mobile
SECTION 2 · ENVELOPE
Is HVAC running at design conditions?
Pass
Fail
N/A
Are windows & exterior doors installed & sealed?
Pass
Fail
N/A
Are wet trades finished (paint, mud, tile)?
Pass
Fail
N/A
Why?
Bathroom tile still going in. Grout float visible at doorway.
📷 Photo attached · GPS + timestamp
3

The moisture readings

ASTM F2170 requires 3 tests for the first 1,000 sq ft plus 1 per 1,000 after that. The app calculates the count from the room area and refuses to lock until you meet it.

SpecRecord · mobile
SECTION 4 · SUBFLOOR (CONCRETE)
Required: 5 readings · Captured: 5 · Passes spec
#1Kitchen (east)72.4% RH
#2Kitchen (west)73.1% RH
#3Living rm north71.8% RH
#4Living rm south72.5% RH
#5Bedroom 172.9% RH
✓ Average 72.5% RH · Bona SafeSet S16 max is 85% · in spec
4

Sign-offs on-site

Installer signs. General contractor signs (or types their name if not on site). If any item was Fail, the app offers a Notice, Protest and Assumption of Risk — every party documents what was known and who decided to proceed.

SpecRecord · mobile
SECTION 8 · SIGN-OFF
INSTALLER
Sam Torres · PID Floors
SIGNED ✓
GC
M. Chen · Elm Ridge Builders
SIGNED ✓
ARCHITECT
skipped
END USER
J. Patel (arrived on-site)
SIGNED ✓
Conditions were out of spec
Wet trades not finished — bathroom tile in progress. Owner & GC directed install to proceed for occupancy Friday.
→ Notice / Protest / Assumption of Risk filed. All parties signed.
5

Lock & seal

At lock time, every field + every photo + every signature is canonicalized, hashed, and sealed with an HMAC. The hash is submitted to OpenTimestamps for Bitcoin anchoring. The record becomes immutable — nobody, including us, can rewrite what happened.

🔒
SEALED
record #REC-A8F92C4E · locked 2026-07-15T14:22:04Z
sha256 · 4a1c3e07b9f2…dae198e0b1
HMAC seal · SpecRecord · v1
OpenTimestamps · pending Bitcoin anchor
From this moment forward, altering any byte breaks the seal.
6

What an inspector finds

Authorized tenant and property-owner accounts get a read-only view of the sealed record. A QR sticker identifies the record but does not bypass sign-in or grant access.

RECORD · MOISTURE PRE-INSTALL
42 Cedar Court, Unit 3B
Portland, OR · sealed 2026-07-15
▓▓▓
▓ QR ▓
▓▓▓
Complete · 47 of 47 items logged
1 protest filed · signed by installer, GC, owner
Installer · Sam Torres, PID Floors · NWFA #4218
Product · Bona SafeSet S16 · Lot 24-A9F2
Subfloor · Concrete · avg 72.5% RH (spec: 85% max)
Ambient · 72°F · 41% RH · HVAC running
Sign-offs · Installer, GC, End user · Architect skipped
Photos · 12 attached · GPS + timestamp on each
sha256 · 4a1c3e07b9f2…dae198e0b1
HMAC seal verified · OpenTimestamps anchor pending Bitcoin confirmation
THAT'S IT
One install. Six sections. Sealed record on file.
The floor might fail in two years. The record won't. It says what was true the day it was installed and who signed off on the conditions.
Create a free NWFA account →Or schedule a live walkthrough →